Picture Index

dcp_1266.jpg


Most of the lumber gone now, all moved upstairs.
Comments(0)
dcp_1267.jpg


Comments(0)
dcp_1268.jpg


Comments(0)
dcp_1269.jpg


The third joist has been nailed in, and now supports two 4x8 sheets of plywood.
Comments(0)
dcp_1270.jpg


Comments(0)
dcp_1271.jpg


Two more joists and a third sheet. New electrical wiring runs between the joists.
Comments(0)
dcp_1272.jpg


Comments(0)
dcp_1273.jpg


Comments(0)
dcp_1274.jpg


Comments(0)
dcp_1275.jpg


All the knob & tube wiring has now been replaced with a modern, and significantly safer alternative.
Comments(0)
dcp_1276.jpg


Here we connected the new wiring and the molex down to the outlets in the walls. Enough slack remains here so when the walls downstairs get stripped, the new wiring will be pulled down to replace the old.
Comments(0)
dcp_1277.jpg


Comments(0)
dcp_1278.jpg


Few problems that can't be solved with a drill, a hacksaw, and a hammer.
Comments(0)
ics&theme=0ics&theme=0ics&theme=0ics&theme=0ics&theme=0ics&theme=0